25 | On 09/07/2023 at 9:30 AM, Licensing Program Analyst (LPA) P. Watson arrived announced to conduct Pre-Licensing inspection. LPA met with Administrator, Felomena Tabones and explained the purpose of the visit. The facility currently has no residents/clients.
LPA toured facility with Felomena including but not limited to 5 bedrooms, 2 bathrooms, kitchen, common areas and backyard. Bedrooms and living rooms were equipped with the proper furniture. Bathrooms were equipped with grab bars and non-skid mats. Linens and hygiene supplies were observed. There is sufficient lighting throughout facility. Room temperature was maintained at 69 degrees Fahrenheit and hot water temperature was maintained at 120 degrees Fahrenheit. First-aid kit was observed to be complete. Smoke detectors and carbon monoxide were operational. Fire extinguisher was last serviced on 09/07/2023.
No issues noted during inspection. LPA observed that facility is ready to be licensed. This report will be submitted to the Central Applications Bureau (CAB) and a final review of the application will be conducted. This facility is not yet licensed and is subject to final approval by CAB. Additional requirements may still be required.
Exit interview conducted and a copy of this report provided. |