| On August 2, 2023, Licensing Program Analysts (LPAs) Nancy Her and Ruby Ocegueda conducted an announced case management inspection and met with Family/Community Services Liaison Shawna Wilbourn. LPAs explained the reason of the inspection and a tour of the center was conducted both inside and outside.
On May 04, 2023, the following was requested to be corrected before licensure:
· Water dispenser installed with cup dispensers
· Toys, play structure, shade structure, cement track for the outside play yard will be installed.
· Rocks, holes, uneven ground, and other hazardous items in the play yard will need to be made safe for children.
· The storage cabinets in front of the kitchen/office needs to be anchored.
· In girls bathroom, the changing table needs a changing pad.
· In the boys bathroom, a changing table will need to be installed with a changing pad.
· Both bathrooms will need to have storage shelving units installed.
· Classroom B’s entrance door has rust. The wall outside classroom A has rust. Rust will need to be taken care of.
· Ceiling tiles that are chipped, lifted, or has water stains will need to replaced/fixed.
· The outdoor passageway from classroom to playground is going to be constructed into a cement walkway.
|