LPA Shawna Doucette arrived at the facility unannounced to conduct an annual inspection. LPA was granted entry by Staff Vachagan Margaryan and Staff Arusyak Ayvazyan. LPA explained the purpose of the visit and staff contacted Administrator Hasmik Nshanyan who responded to the facility to assist with the visit.
A tour of the facility was conducted with the Administrator. The residence was set at 68 F temperature and free of passageway obstructions inside and outside.
Kitchen toured, supply of food observed and food stored properly for perishable and nonperishable. Medications were stored in a locked cabinet in the kitchen. Cleaning supplies were locked in the laundry room. Smoke detectors and carbon monoxide detectors were checked and operating. Fire drill was last conducted 10/18/23. LPA checked water temperature which measured at 111.2 F.
There was outdoor seating for the residents.
Resident, medication and staff records were reviewed. LPA observed a medication error for R1. R1 ran out of all medications however the start date was 10/16/23 for 30 pills which indicates R1 should have 7 pills remaining. R1 was out of PRN medications and facility did not have a log for the PRN medication. Current first aid and CPR were reviewed.
R2 and R3 did not have Hospice Care Plans.
Staff records indicate Staff Arusyak Ayvazyan was not cleared to be working in the facility.
Refer to 809d for deficiencies. Civil Penalty was issued.
A copy of this report with plan of correction and appeal rights were provided to the Administrator.
|