1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32 | All floors were observed to be clean and safe. All materials accessible to children were observed to be toxic-free There are no firearms stored on the premises.
Outdoor playground is located in the public park and is an open space. Equipment is in a safe condition, free of sharp, loose or pointed parts. The surface of the outdoor activity space is maintained in a safe condition and is free of hazards. All areas around or under high climbing equipment, swings, slides, and similar equipment are cushioned with material that absorbs a fall. There is adequate shade in the play yard. Availability of outdoor drinking water was observed. LPA advised that no children shall be left without the supervision of a teacher at any time.
Children’s Records were reviewed for completeness. Immunization Records, LIC 700- Identification and Emergency Information, LIC 627- Consent for Medical Treatment, LIC 995A Notification of Parents’ Rights, LIC613A-Personal Rights, LIC702 Health History and LIC701- Physicians Report. Inspection of required forms was made and documented on the LIC 857.
Staff records were reviewed for approved Pediatric First Aid and CPR certification, LIC-501: Personnel Record, LIC 508-Criminal Record Statement, LIC 9052- Employee Rights, Proof of immunization against measles, pertussis and influenza or influenza declination, TB clearance or risk assessment, LIC 9108- Statement Acknowledging Requirement to Report Child Abuse and current Mandated Reporter Training Certificate.
Children's roster was reviewed and is current. Sign-In and Sign-Out sheets were reviewed. Children present were signed in. Disaster drill log was available, last drill was conducted in 04/15/25. First Aid supplies were observed in the classroom. According to Lead Teacher, medication is not administered at the facility.
Assembly Bill (AB) 2370, Chapter 676, Statutes of 2018, requires all licensed Child Care Centers (CCCs) constructed before January 1, 2010, this building was constructed on 06/22/2013.
|