25 | At 11:30am Licensing Program Analyst (LPA), Angela Panushkina, conducted an unannounced annual inspection at the facility mentioned above. LPA was greeted by staff, Jovita Saldo, who granted access to the facility. At approximately, 11:35am physical tour was conducted with the staff and LPA observed the following:
Infection control: LPA reviewed the facility mitigation plan (approved on 02/11/2021) to make sure licensee was following current infection control recommendations. Upon arrival, LPA was screened and asked to sign-in the visitors’ log. In addition, LPA was asked all infection control questions. Proper signage was observed inside along the hallway and in the restrooms. Hand sanitizer was also observed. Jovita Saldo stated they have sufficient PPE supplies for residents and staff. LPA observed all trash can throughout the facility have fitted lids.
Kitchen: At approximately, 11:37am LPA toured the kitchen area and observed enough supplies of staple non-perishable for minimum 1 week and perishable for 2 days at the facility. All knives and sharps are observed to be locked in a kitchen drawer and inaccessible to residents.
Smoke detectors/carbon monoxide. Dual smoke and carbon monoxide detectors were located throughout the facility, and at 12:40pm they were tested and observed to be operational.
Bedrooms: There are four (4) bedrooms designated for residents use and have sufficient lighting. All bedrooms are properly furnished, clean and have appropriate bedding and linens. Auditory alarms were tested and observed to be operational.
Bathrooms: At 11:45am LPA observed all bathrooms are clean and in good repair. Properly supplied with toilet papers, soap and paper towels. The hot water temperature measured at 110.9°F. LPA observed appropriate grab bar and had non-skid mat. LPA observed appropriate hand washing signs posted in each bathroom. All trash cans in bathrooms had fitted lids to protect from cross contamination.
Continue on LIC809-C |