1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | On June 29, 2022 at 8:50 AM, Licensing Program Analysts (LPAs) Monique Ayala and Mayra Rivera conducted an announced inspection at the facility noted above and met with Director, Mary Brammer. The purpose of the inspection was to conduct the required inspection for a pending Capacity Change. This facility is currently licensed for 125 preschool children and is requesting to increase their capacity to 136 preschool children. This facility consists of 6 classrooms: Room 1, Room 2, Room 3, Room 4, Room 5, and Room 6. The operating hours for this facility is Monday through Friday from 6:30 AM to 6:30 PM.
All areas identified on the facility sketch were inspected. Upon arrival, the following staff were present during this inspection: Room 1: Staff #1 and Staff #2 with 19 children; Room 2: not currently occupied; Room 3: Staff #3 with 9 children; Room 4: Staff #4 with 12 children; Room 5: Staff #5 with 9 children, and Room 6: Staff #6 and Staff #7 with 12 children.
LPAs were guided on a tour of the facility accompanied by Director, Mary Brammer. The following was observed during the tour of the facility:
The following documents were posted in a prominent, publicly accessible area at the facility: Facility License, Notification of Parents' Rights (PUB 394), and Earthquake Preparedness (LIC 9148).
Furniture and equipment were inspected for age appropriateness and good repair. Telephone service, heating, lighting and ventilation were evaluated. Children have their own cubby to store their belongings. Napping equipment (cots) were observed inside each classroom. Per Director, sheets are washed weekly by the facility or as needed. |