| The investigation consisted of the following:
On 12/04/2024 Licensing Program Analyst (LPA) Troy Watson reviewed / obtained Resident Roster (dated 12/2024), Staff Roster (dated 12/2024), and Emergency Disaster Plan. Interviews were conducted, with Staff #1 – Staff #8 (S1-S8) and Residents #1- Residents#7 (R1-R7). The facility grounds were toured.
Investigation revealed the following:
Allegation: Staff do not ensure facility fire alarm is in good repair.
It is alleged that the smoke detector is broken and randomly goes off unexpectedly in the facility disturbing its residents. On 12/04/24 LPA Watson interviewed Staff#1 – Staff#8 (S1-S8) regarding the allegation. Of those interviewed 8 out of 8 staff agreed to the allegation. On 12/04/24 LPA Watson interviewed Residents #1- Residents #7 (R1-R7); 7 out of 7 residents interviewed agreed with the above allegation.
On 12/04/24 LPA Watson interviewed Executive Director Clifton Douyon. During the interview, Douyon stated that the smoke detectors located in room 118 and 221 were dysfunctional and needed repair. The director explained that they sounded off intermittently because of construction work being performed on the facility ceiling. During the interview it was also revealed that the triggering of the second smoke alarm was due to rainwater from the roof top of the ceiling.
|