25 | Licensing Program Analyst (LPA) Claudia Gutierrez made an unannounced Plan of Correction (POC) inspection. LPA was greeted and granted entry by. Administrator (AD) Maila Enriquez Soliven and LPA explained the purpose of the inspection.
Deficiencies 1569.605, 1569.625(b)(1), 1569.313, 1569.695(c), and 87468(c)(2)(A) were previously cited on August 6, 2024, during facility's annual/required inspection. During POC visit conducted on September 13, 2024, POCs for citations were extended to close of business Monday, September 16, 2024.
During today's visit, LPA verified four of five POCs have been met. POC for citation 1569.625(b)(1) has been extended to close of business, September 27, 2024.
Based on observations made during today's inspection, no deficiencies are being cited per Title 22 Division 6 of the California Code of Regulations. An exit interview was conducted and a copy of this report was left at the facility.
|