1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32 | Facility has completed the LIC808 Mitigation plan dated 3/21/2021. During today's visit, AD Consolacion and Administrator Assistant Sadraca made additional updates on page 11 of their mitigation plan and resubmitted it to CCL. LPA Quiroz received new updated LIC 808, and approved LIC 808 during today's visit.
During today's inspection visit, LPA Quiroz reviewed six of six resident records. L/AD Consolacion indicated "all residents and staff at facility are fully vaccinated for COVID-19, and will be scheduling booster shots soon."
Based on the observation made during today’s visit, no deficiencies were noted today per Title 22 Division 6 of the California Code of Regulations. LIC 9102 Technical Violation was provided during today's visit for COVID-19 guidance.
This report was reviewed with L/AD Consolacion and Administrator Assistant Edison Sadraca, and a copy of this report, LIC 811, LIC 9102 were provided at exit.
|