1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | On July 28, 2025, at 9:10am, Licensing Program Analyst (LPA) Eboni Bentley conducted an unannounced required 1-Year annual visit using the CARE Inspection Tool. Upon arrival at the facility, LPA Bentley was greeted and granted entry by Caregiver (CG) Monica Vega. Administrator (AD) Magda Rodriguez was contacted by phone and LPA Bentley explained the purpose of the visit. AD Vega gave permission for CG Vega to conduct the facility tour and sign the report during exit interview.
The facility is licensed to operate for six (6) nonambulatory residents, of which one (1) may be bedridden, and has a hospice waiver for two (2) residents. The facility is a single-story building located in a residential neighborhood. It consists of the following: four (4) resident bedrooms, two (2) bathrooms, living area, dining area, kitchen, an outdoor covered seating area, and an attached two car garage, with and office space.
LPA Bentley toured inside and outside of the physical plant with CG Vega. There were no bodies of water or obstructions on the premises. All rooms were inspected. Beds and bedding supplies were in good condition, adequate lighting was provided, storage for each resident’s personal belongings was observed. Bed linens, comforters, and bath towels were adequately stocked at the time of visit. Bathrooms were found to be clean and operational. The water temperature measured 108.8 degrees F to 114.2 degrees F. A comfortable temperature of 75 degrees F was maintained in the facility.
LPA Bentley observed the facility to be sanitary and appropriately furnished at the time of visit. Storage areas for personal hygiene, cleaning supplies, toxins, and sharps objects were stored and not accessible to residents. The kitchen was inspected and there is a two-day supply of perishable and seven-day supply of non-perishable food available and maintained properly.
CONTINUE TO LIC809-C...
|