25 | Licensing Program Analyst (LPA) Pa Dao Vang met Director Raman Clar to conduct a Plan of Correction (POC) inspection on 12/20/2024 at 12:30 PM. A Type B deficiency was cited on 8/29/2024 for an Action Level Exceedance.
On 1/4/2023, the facility completed the Lead Testing with an outlet faucet D tested with Action Level Exceedance with 8.6 ppb. The facility replaced the outlet on 12/6/2024. Director also explained the facility have not retest the sink for lead. She’ll reach out to Licensee Representative to retest the sink.
On today's date, LPA observed 3 children present in the Preschool classroom supervised by 2 staff. As of 12/20/2024, the Plan of Correction is not cleared. Facility will need to retest the faucet D for lead and notify LPA.
This report was reviewed with Director Raman Clar. A copy of this report, appeal rights, and a notice of site visit was provided to be posted for 30 consecutive days. |