1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | Licensing Program Analyst (LPA) Samuel Lopez arrived at the facility to follow up on the initial Prelicensing inspection conducted on 8/24/2023. At the conclusion of that inspection, a list of items that needed completion was provided. During today's inspection, LPA toured the facility and verified that the facility has corrected all items required for licensure.
Upon management completing a final review, the application will be submitted for approval with a maximum capacity of 110 children.
Exit interview conducted and report was reviewed with Elizabeth Mulligan, Area Director, Child Development Services |