32 | Regarding the ceiling leak, Director provided LPA with pictures of the ceiling showing multiple water-stained ceiling tiles and the work orders to have the ceiling tiles replaced. Confidential interviews and records review disclosed that ceiling tiles were wet and observed to be leaking intermittently in Room #2 since mid-February. This issue had been brought to the attention of the Director and the Assistant Director and someone was supposed to come out and look at the ceiling. Confidential interviews also disclosed that ceiling tile was observed to be wet, bulging and stained multiple times before being properly fixed. Director also stated that the ceiling was fixed on the evening of Friday, March 17, 2023, but it rained over that weekend and on Monday, March 20, 2023, the ceiling tile was leaking and bulging again. Staff placed buckets and blankets underneath the leaking tile(s). Confidential interviews revealed to LPA that the facility continued to conduct class and children continued to nap in this classroom; whereas other confidential interviews disclosed the children were not allowed to nap or play under the bulging, wet ceiling tile(s). During LPA’s inspection on March 22, 2023, LPA observed the ceiling tiles had been replaced and Director stated the repairs to the roof and ceiling were completed about 10am on March 20, 2023. Director also stated there was no evidence of mold, mildew or smell in the classroom per maintenance or that she observed. Director provided LPA with documentation showing the Director noted the ceiling tiles needed to be repaired on January 10, 2023, and March 15, 2023 and Assistant Director submitted request to maintenance to have the ceiling tile(s) replaced on March 17, 2023.
Regarding the toilet not flushing in the bathroom between Room #2 and Room #4, LPA was present at the CCC on March 22, 2023, and observed the toilet closest to the wall not working. Per document review, Director provided LPA with documentation showing the CCC has been having problems with this particular toilet since October 2022. The most recent request for maintenance on the toilet was submitted by Assistant Director dated March 15, 2023, still has not been resolved as of May 16, 2023 per conversation with Director. Director also stated that facility is working on totally replacing the toilet but is not aware of a purchase order for a new toilet. On this date, LPA observed toilet to have tape across the seat so that it is not used by children in care due to toilet still not operative.
Based on confidential interviews, records review and observation, the preponderance of evidence has been met and the allegation that staff do not ensure the facility is in good repair is substantiated. The facility is being cited for Title 22, Section 101239( e)(4) Fixtures, Furniture, Equipment and Supplies and Section 101238(a) Building and Grounds which poses a potential health and safety risk to children in care. |