25 | On 10/09/23 at 10:46am, Licensing Program Analysts (LPA), Samantha Clenista and Patrick Ma conducted an announced Pre-licensing follow-up inspection. Upon arrival, LPAs met with Facility Representatives, Lona Seitz (Children’s Paradise COO), Diane Prospero (Children’s Paradise Director of Child Development) and newly assigned center director, Vanessa Sanchez.
LPAs took a tour of the facility per facility sketch. The initial pre-licensing inspection was conducted on 09/19/23. Purpose of this visit is to follow-up on the corrections that were needed to be corrected prior to licensure. The following were the listed corrections that LPA noted during 09/19/23 inspection:
- Submit a shared playground waiver request for the school-age children to share the upper preschool playground
- Obtain fire clearance for the preschool to use the multi-purpose room
- Submit an updated indoor and outdoor facility sketch
- Label school-age bathroom
- Post required postings
- Make the doors to the kitchen and laundry room inaccessible
- More cushioning to the falling hazard areas in the upper playground structure.
After the initial pre-licensing inspection, facility made a change to the multipurpose room and split it into two separate spaces, one side is designated for preschool children and the other side is a space for school-aged children, however facility is requesting to share this space with the preschool children at separate times. Updated fire clearance was provided on 09/28/23. LPAs observed a barrier in the middle of the multipurpose room that is higher than 4 ft. high. LPAs measured the school-aged side, and it measured at 1,374.55 sq. ft., sufficient for 39 children at one time, which facility would like to update their capacity to reflect 39, rather than 28. |