25 | On day and time listed above, Licensing Program Analyst (LPA) Keely Messerschmidt, made an unannounced Case Management inspection, for water lead testing not being completed by January 1, 2023. LPA met with Director Lydia Cabellero notifying her the reason of todays visit. There were 18 children present during the inspection.
Based on records review and information received after January 1, 2023, and current policies and procedures for the Department, the facility is being cited for not having their water tested, under the Written Directives, Section 101700.3 (b) (1) California Lead Action Level at Child Care Centers. This poses a potential health, safety, or personal rights risk to the children in care.
An exit interview was conducted, a copy of this report, LIC809D and appeal rights were handed to facility Director, Lydia Cabellero. A notice of site visit was given and must remain posted for 30 days.
|