1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | On June 10, 2025, Licensing Program Analyst (LPA) Leong conducted an unannounced annual visit. LPA met with Licensee Dantong Chen (S1) and explained the purpose of the visit.
S1 and her two assistants (S2 and S3) were caring for six (three infants and three pre-k) children during today’s visit. Another adult (S4) was also present on the upper level of the home. For today's visit, the facility is observed within capacity limits and ratios.
LPA verified with the CDSS Background Check System that S1, S2, S3, and S4 have current criminal record clearances and are in eligible status.
The facility license, Notifications of Parents’ Rights, and Earthquake Preparedness Checklist were displayed on the wall.
The last emergency disaster drill was conducted on March 26, 2025, and documented in the facility log. Previous drills confirmed they had been conducted at least once every six months.
The daycare areas consist of the entire in-law, including a living room, a bathroom, bedroom #1 #, bedroom #2, and the front part of the backyard on the lower level
The off-limit areas consist of the entire upper level, the garage,the two garage storage rooms and the rear part of the backyard. S1 understands that off-limits areas may not be used for childcare during business hours. Off-limits areas are blocked off with a gated door to the upper level and a fence that blocks off the rear of the backyard.
A health and safety inspection of the indoor and outdoor daycare areas found the home clean and well-ventilated. Hazardous materials were inaccessible to the children. The bathroom was sanitary and fully operational. The facility has a fire extinguisher, a first aid kit, a carbon monoxide detector, and a smoke detector.
See Page 2
|