25 | On February 27, 2024, Licensing Program Analyst (LPA) Van met with the Director, Qi Wen, for an unannounced inspection of the Plan of Correction (POC). Upon arrival, LPA rang the doorbell, but nobody answered. LPA contacted the director and was informed that the children were at the park and on their way back to the center. Approximately 7 to 10 minutes later, the children, the Director, and a teacher returned to the facility. LPA explained the purpose of the inspection to the Director, who then granted LPA entry to the Center. There were six children whom the director and a teacher were supervising.
During the annual inspection on January 17, 2024, the Center was found to have multiple deficiencies. These included the failure to conduct fire and earthquake drills every six months, staff not completing the mandated reporter training, immunization records missing, and water lead testing not being conducted before January 1, 2023, as required by the Directive.
During today's inspection, LPA found that the log for fire and earthquake drills was appropriately documented and maintained. Water lead testing was done on Jan 23, 2024, and test results were within the 5.5 ppb threshold and have been uploaded on the Water Board site. All mandated reporter training for all staff has been completed, and all immunization records have been maintained. All deficiencies cited during the January 17, 2024, inspection have been cleared today.
An exit interview was conducted with the Director, and a consultation was provided. In today's inspection, no deficiencies were observed. The Director, Qi Wen, read and signed the report. Today's report and notice of the site were provided to the Director. LPA informed the Licensee that a site visit notification must be posted for 30 days. Failure to comply with posting requirements shall result in an immediate civil penalty of $100. |