1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | Unannounced Plan of Correction visit made out to this facility on 12/07/2023 by Licensing Program Analyst (LPA) Charlie Yang who was met by the facility designated Administrator, Pedro Pancho, at this time. A brief interview was conducted with the facility designated Administrator at this time.
The purpose of this visit was to follow up on the deficiencies that were cited on a prior annual visit dated on 11/27/2023:
An Infection Control Plan shall be developed by the licensee and shall be included in the Plan of Operation required by Section 87208. (1) The Infection Control Plan shall include all of the following: (C) An Infection Control Training Plan. 1. Initial training requirements for new facility staff shall be addressed in the plan, with training to be provided by the Infection Control Lead before staff works independently with residents.
An Infection Control Plan shall be developed by the licensee and shall be included in the Plan of Operation required by Section 87208. (1) The Infection Control Plan shall include all of the following: (C) An Infection Control Training Plan. 2. Ongoing training requirements for all facility staff shall be addressed by the plan, with training to be provided by the Infection Control Lead.
The Plan of Correction was reviewed and clearance letter was printed out and a copy was given to the facility designated Administrator at this time.
There were no deficiencies observed or cited during today's visit.
Exit Interview |