25 | Licensing Program Analyst (LPA) Robert Maciel made a Case Management visit for the purpose of reviewing plans to construct a shade structure in the outdoor play area and met with Director Teri Porter and facility board member Stuart Nissenbaum, who is responsible for overseeing the construction.
LPA reviewed the proposed location for the shade structure, which is to be built in the back side of the outdoor play area, next to the large play structure. The surface of the area is currently bark and will be replaced with concrete to support the construction. The structure itself will not have any walls, it is only supported by four beams, thus not reducing the available activity space in the backyard.
Director stated that construction is planned to begin on 10/7/24. LPA requested the Director submit an updated LIC999 Facility Sketch to record the new layout of the outdoor play area to the department before construction begins. |